Twenty three years on about nine streets.

Most developers grow by adding sites. We grew by turning them down.

2003

The first building

Emrys Vaughan bought one period building off Bury Court in the City and spent eighteen months putting it right. There was no outside money in it and no second site until the first was finished.

2006

Period stock, one at a time

A run of buildings in the Square Mile and the prime districts west of it. Bought when the offices around them were emptying, held through the crash, sold once the street had come back.

2012

The rule that stuck

The firm stopped bidding on anything that was not on a street where supply is fixed. It has cost us deals every year since. It is still the rule.

2016

North, then west

The first site outside London, in Edinburgh, taken on the argument that a settled address in the New Town behaves the same way as a settled address in Kensington.

2019

Dublin, and then the island

Ballsbridge and then Kampen on Sylt, both bought against the same test: a street nobody can add to, in a place people already want to be.

Today

Six on the books

Six schemes across four countries, run from the same Bishopsgate office by the same people, and still owned entirely by them.

Founded in the City of London in 2003, and still working from the same Bishopsgate address.

What we do

  • Buy on streets where nothing more can be built
  • Fund every scheme from our own balance sheet
  • Agree one specification before the first foundation
  • Stay on as managing agent where owners want us

What we do not

  • Build to a volume target
  • Take outside equity or list the company
  • Sell in bulk to investors off plan
  • Start a second site before the first is handed over

Five tests a site has to pass.

A site that fails any one of them is turned down, however good the price looks.

Supply

The street cannot be added to.

Demand

Buyers already live nearby and want to stay.

Fabric

What stands is worth keeping, or worth replacing properly.

Consent

The planning route is visible before we bid.

Hold

We could carry it four years if we had to.

Six addresses are open now.

Two are finished and can be walked round this week. The other four are on site.